Variable Demand, Main time betyween failure (MTBF), Preventive maintenance (PM),

Analysis of Hulling System in Rice Mill Plant With Variable Demand

Authors

Iti Sao1 | Hemant Kumar Saw2 | Prachi Singh3
Government V. Y.T.Auto.P.G.College, Durg Chhattisgarh, India 1 Mathematics Government Digvijay P.G. College Rajnandgaon, (C.G)India 2 Government V. Y.T.Auto.P.G.College, Durg Chhattisgarh, India 3

Abstract

 This main objective of the present study is to analyse  profit analysis  of a Rubber Roller in  hulling system used in rice-mill with change in demand of Rice. We consider two type of upstate when demand is more than or equal to supply and Supply is more than demand. When there is less demand or supply is more than demand the operative unit put in down state. preventive maintenance (PM) carried on  during downtime There is a single server who visits the system immediately whenever needed to carry out preventive maintenance and repair. The analysis incorporates the Weibull distribution to model the failure and repair times of the hulling system components, Using semi Markov process and regenerative point techniques various reliability characteristics are obtained.

Article Details

Published

2024-02-26

Section

Articles

License

Copyright (c) 2024 International Journal of Engineering and Computer Science Creative Commons License

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

How to Cite

Analysis of Hulling System in Rice Mill Plant With Variable Demand . (2024). International Journal of Engineering and Computer Science, 13(02), 26031-26038. https://doi.org/10.18535/ijecs/v13i02.4792