Abstract
The objective of this paper is to present an effective new methodology to optimize the maintenance costs of bridges stock. Optimization takes place at the network level and not in a project level (bridge by bridge). The dynamics of passage between bridges condition state (from 1 to 5) is achieved by the Markov chains probabilistic method. The Markov transition matrix is determined either by ratios of total areas and areas degraded annually, or by the resolution of an optimization problem. In the latter case, the nonlinear optimization algorithm SQP (Sequanciel Quadratic Programming) is developed. A bridge maintenance matrix is introduced in the calculation of the repair cost. The originality of our approach is to parameterize this matrix by introducing the different optimization variables of the problem. Finally, the cost function to be optimized annually is calculated and optimized by a genetic algorithm. This cost function represents the cost of maintaining the entire asset.
Keywords:
Markov chain simulation, Genetic SQP optimization, Bridge deterioration modeling, Transition probability matrix, Maintenance matrix, Network level
References
• Agrawal, A. K., Kawaguchi, A., and Chen, Z. 2009. Bridge element deterioration rates, Rep. No. C-01-51, New York State DOT, Albany, NY.
• A. Butt, M. Y. Shahin, K. J. Feighan, and S. H. Carpenter. 1987. Pavement performance prediction model using the Markov process, Transportation Research Record, pp. 12-19.
• M. Cesare, C. Santamarina, C. Turkstra, and E. Vanmarcke. 1992. Modeling bridge deterioration with Markov chains, Journal of Transportation Engineering, vol. 118, no. 6, pp. 820-833.
• H. Elbehairy. 2007. Bridge management system with integrated life cycle cost optimization, University of Waterloo. Ph.D. thesis, Ontario, Canada.
• Reginald W. Stratt. 2010. Bridge Management a System Approach for Decision Making, PhD thesis, Department of Engineering and Technology in the School of Doctoral Studies of the EU, Belgium.
• G. Morcous, Z. Lounis. 2005. Maintenance optimization of infrastructure networks using genetic algorithms, Automation in Construction, 14 129-142
• G. Morcous. 2006. Performance prediction of bridge deck systems using Markov Chains, Journal of Performance of Constructed Facilities, American Society of Civil Engineers, vol. 20, No. 2.
• Milhan Moomen, Yu Qiao, Bismark R. Agbelie, Samuel Labi, Kumares C. Sinha. 2016. Bridge Deterioration Models to Support Indiana’s Bridge Management System, Report Number: FHWA/IN/JTRP
• Niroshan K. Walgama Wellalage; Tieling Zhang and Richard Dwight. 2015. Calibrating Markov Chain–Based Deterioration Models for Predicting Future Conditions of Railway Bridge Elements, J. Bridge Eng.
• J. Yi, M. Saito, and K. C. Sinha. 1988. Bridge performance prediction model using the Markov chain Transportation Research Record, Transportation Research Record, no. 1180, pp. 25-32.
• O. S. Thomas and J. O. Sobanjo. 2016. Semi-Markov Decision Process: A Decision Tool for Transportation Infrastructure Management Systems, International Conference on Transportation and Development.
• Paul D. Thompson, Kevin M. Ford, Mohammad H. R. Arman, Samuel Labi, Kumares C. Sinha, and Arun M. Shirole. 2007. Estimating Life Expectancies of Highway Assets, NCHRP report 713
• Vandana Patidar, Samuel Labi, Kumares C. Sinha, Paul Thompson. 2007. Multi-Objective Optimization for Bridge Management Systems, NCHRP report 590.
Downloads
Download data is not yet available.