In this research paper, main concentrate of the authors on the profit comparison of computer system with hardware redundancy by introducing the concept of priority to software up-gradation, hardware preventive maintenance (PM) and hardware maximum repair time (MRT). The system fails independently from normal mode. All the repair activities such as hardware repair, software up-gradation, hardware preventive maintenance before failure and hardware replacement after maximum repair time are carried out by a single server immediately on need basis. All random variables are statistically independent. The negative exponential distribution is taken for the failure time of the component while the distributions of repair time, up-gradation time, preventive maintenance and replacement time are assumed arbitrary with different probability density functions. Semi-Markov process and regenerative point technique are used. The behaviour of profits of the system models have been examined for different parameters and costs.
References
S. Osaki, “Reliability analysis of a two-unit standby redundant system with preventive maintenance”, IEEE Transactions on Reliability, vol. R-21 (1), pp. 24 – 29, 1972.
M. Rander, S. Kumar and A. Kumar, “Cost analysis of a two dissimilar cold standby system with preventive maintenance and replacement of standby”, Microelectronics Reliability, vol. 34 (1), pp. 171 – 174, 1994.
Welke, S. R., Labib, S. W. and Ahmed, A. M., “Reliability Modeling of Hardware/ Software System”, IEEE Transactions on Reliability, vol.44 (3), pp.413-418, 1995.
S.C. Malik, P. Nandal and M.S. Barak, “Reliability Analysis of a System under Preventive Maintenance”, Journal of Mathematics and System Sciences, vol. 5 (1), pp. 92 – 115, 2009.
Anand, Jyoti and Malik, S.C., “Analysis of a Computer System with Arbitrary Distributions for H/W and S/W Replacement Time and Priority to Repair Activities of H/W over Replacement of the S/W”, International Journal of Systems Assurance Engineering and Management, vol.3 (3), pp. 230-236, 2012.
Kumar, Jitender; Kadyan, Mukender Singh and Malik, Suresh Chander, “Cost-analysis of a two-unit cold standby system subject to degradation, inspection and priority”, Maintenance and Reliability, vol. 14(4), pp. 278-283, 2012.
Malik, S.C. and Sureria, J.K., “Profit Analysis of a Computer System with H/W Repair and S/W Replacement”, International Journal of Computer Applications, vol.47(1), pp. 19-26, 2012.
Malik, S.C., “Reliability modeling of a computer system with preventive maintenance and priority subject to maximum operation and repair times”, International Journal of System Assurance Engineering and Management, vol. 4 (1), pp. 94-100, 2013.
Barak, Sudesh K. and Malik, S.C., “A Standby System with Priority to Repair over Preventive Maintenance”, International Journal of Engineering Research (IJER), vol. 3(4), pp. 241-244, 2014.
Malik, S.C. and Munday, V.J., “Stochastic Modeling of a Computer System with Hardware Redundancy”, International Journal of Computer Applications, vol. 89(7), pp. 26-30, 2014.
Kumar, Ashish, Barak, Monika S and Malik, S.C., “Economic Analysis of a Computer System with Software Up-gradation and Priority to Hardware Repair over Hardware Replacement Subject to Maximum Operation and Repair Times”, International Journal of Scientific and Engineering Research, vol. 6(4), pp. 1661-1668, 2015.
Munday, V.J., Permila and Malik, S.C. “Stochastic Modeling of a Computer System with Hardware Redundancy Subject to Maximum Repair Time”, International Journal of Computer Science Engineering, vol. 4(5), pp.228-236, 2015.
Munday, V.J. and Permila, “Reliability Measures of a Computer System with Hardware Redundancy and Priority to Software Up-gradation” International Journal of Statistics and Reliability Engineering, vol. 2(2), pp. 117-128, 2015
[Munday, V.J. and Malik, S.C. “Stochastic modelling of a computer system with software redundancy”, International Journal of Engineering and Management Research, vol. 5(1), pp.295-302, 2015.
Munday, V.J., Permila and Malik, S.C. “Reliability modelling of a computer system with hardware redundancy subject to preventive maintenance”, International Journal of Statistics and Reliability Engineering, vol. 3(2), pp. 176-189, 2016.
Munday, V.J., Permila and Malik, S.C. “Analysis of a computer system with software redundancy subject to preventive maintenance”, International Journal of Engineering Research and Technology, vol. 8(12), pp. 604-610, 2019.